5963 SW 25 RD & I-95 SB Off Ramp

ID Status Date FDOT Project No.
#2826 On Hold T6556 - : 443896-1-52-02
Joel Yanez

Asset ID
5963 SW 25 RD & I-95 SB Off Ramp

User Email
Joel@auminc.us

FDOT Project No
T6556 – : 443896-1-52-02

Contractor Full Name
Joel Yanez

Contractor Email
Joel@auminc.us

Contractor Company
AUM Construction, Inc.

Contractor Phone
(305) 978-5415

Engineer Full Name
DACHA QUINTANA, P.E

Engineer Email
milad.mansouri@dot.state.fl.us

Engineer Company
BCC ENGINEERING, LLC

Engineer Phone
(305) 986-9530

Completion Requested by
2024-06-13

Controller Provided to TSS
yes

Date
2024-06-13

Controller Cabinet Provided by TSS
no

Video Camera Model
FLIR

Video Camera Manufacturer
Control Technologies

Video Camera SDLC Port Connection
yes

Christian Viaud

 The Signal Plans associated with both CTR’s are incorrect. They are missing the SOPs and the signal heads among to many others crucial details to develop the future timing.

Also, both intersections only work with one signal cabinet that is located on [I-95 NB On & SW 25 Rd Asset # 4786]. [I-95 SB Off & SW 25 Rd Asset # 5963] does not have signal cabinet or controller, it depends on Asset # 4786.

For now, they will be placed on hold until we are provided with the required data.

Joel Yanez

See attached with SOPs and signal heads.

Write a reply

To reply to this ticket, please go to your admin panel.
Item Status Opt-in Date Opt-out Date Action
Subject
Additional Information
Subject
Additional Information