---
title: How to create a signature
description: Open a request and go to the bottom of the page until you see the three tabs Reply, Signatures, and Attachments. Then click on the Signatures tab and Add Signature. Write the signature you want to show every time you…
url: "https://ctr.miamidadeatmsproject.com/docs/how-to-create-a-signature/"
updated: "2023-04-21"
category: Staff
---

# How to create a signature

Open a request and go to the bottom of the page until you see the three tabs Reply, Signatures, and Attachments.

Then click on the Signatures tab and Add Signature.

Write the signature you want to show every time you post a comment.

![](http://ctr.miamidadeatmsproject.com/wp-content/uploads/2022/09/signature-1024x241.jpg)
